Competency Constraints and trade-offs primary Design and sizing supporting

What you should take away: Evaluate a transformer rating against both an upper loading limit and a lower utilisation limit, accepting a band of defensible sizes.

The situation

What is happening

A 620 kVA connected load is reviewed at a 70 % demand factor with a 10 % growth allowance. The project wants the transformer loaded between 55 % and 85 % after growth. Specify a standard rating from 500, 630, 800 or 1 000 kVA.

Given

Scenario values with units
QuantityValueUnitNote
Connected load 620 kVA Connected equipment rating.
Demand factor 70 % Applied to connected load.
Future growth 10 % Applied after demand.
Minimum loading 55 % Avoids an oversized transformer.
Maximum loading 85 % Leaves margin for starting and growth.

Assumptions this challenge makes

  • The demand and growth factors are project assumptions.
  • The candidate ratings are the four listed standard sizes.
  • Loading is based on demand after growth, not on the connected load.

Limits this decision must satisfy

Project limits the submitted value must satisfy
Limit Requirement If it is breached
Maximum loading after growth not more than 85 % Above 85 % the transformer has too little spare capacity for motor starting and future load.
Minimum loading after growth not less than 55 % Below 55 % the transformer is oversized, adding no-load losses and capital cost without useful margin.

Choose 500, 630, 800 or 1 000 kVA. More than one rating may satisfy the loading band.

Your call

Your answer

Choose 500, 630, 800 or 1 000 kVA. More than one rating may satisfy the loading band.

What this challenge does not establish

  • Loading is a steady-state screening ratio; motor starting, harmonics and ambient temperature are not modelled.
  • The demand and growth factors are assumptions, not measured load data.
  • The lower 55 % limit is a project preference, not a universal code requirement.