Concrete Quantity Takeoff & Pour Schedule

A structured engineering working worksheet for planning concrete quantities and pour logistics. Enter your own project data — the workbook calculates net volume and total ordered concrete from your dimensions, quantity, and waste factor using the same engine as the Concrete Volume Calculator.

What this workbook is

A practical, printable takeoff and scheduling template for an individual project — not an automated quantity-takeoff from drawings, not a BOQ platform, and not a managed project database. It holds your entries and calculates only the numbers your own inputs support. Verify all quantities with a qualified engineer before ordering or pouring.

  • Dark cells are calculated automatically and are not editable.
  • Light cells are user-entered — leave a field blank when you do not have the value.
  • Assumptions and method are stated in the Notes & Assumptions section.

Project Information

Quantity Takeoff

Item / Element Location Element description Length (m) Width (m) Height/Thickness (m) Quantity Unit Calculated Volume (m³) Waste Factor (%) Total Concrete Quantity (m³) Remarks
Gross Concrete Quantity (m³)

Dimensions are in metres. Calculated Volume is shown for every complete set of dimensions; Total Concrete Quantity is shown only when dimensions, Quantity, and Waste Factor are all entered — a blank waste factor is never treated as 0%.

Pour Schedule

Pour ID Date Element / Location Concrete grade / class Planned volume (m³) Planned start time Estimated duration (h) Truck / load reference Actual volume (m³) Status Remarks
Totals (m³)

Schedule values (grades, durations, truck references, status) are project-specific and are left for you to fill in. Planned and actual volume totals are summed from the entered values only.

Notes & Assumptions

  • Calculated Volume = Length × Width × Height/Thickness, computed by the Engineering Concrete Volume engine (V = L × W × D) used by the Concrete Volume Calculator.
  • Total Concrete Quantity = Calculated Volume × Quantity × (1 + Waste Factor / 100). A total appears only when dimensions, Quantity, and Waste Factor are all entered; a blank Waste Factor is never silently assumed to be 0%.
  • Quantity is the number of identical elements/units (enter 1 for a single element). Waste factor, concrete grade, pour durations, and truck references are project decisions and are left to the user — no engineering defaults are invented.
  • Blank remains blank. Any field without a value stays empty (and produces no calculated total).
  • Scope. No automated takeoff from drawings, no BOQ database, no contract document. This template does not claim compliance with any specific takeoff or estimating standard.