Size the daily storage cycle
Turn production and delivery windows into a working inventory, safety buffer and ideal-gas vessel volume.
- Advanced
- 15 stages
- 14 min
- Process and energy systems
After this stage you can
- Build a 24-hour inventory from owned windows.
- Separate working mass, safety mass and required inventory.
- Report an ideal-gas volume with the usable-fraction assumption.
The engineering
A 24-hour mass schedule is stepped from the production window and the delivery window. The spread between maximum and minimum inventory is the working buffer. A safety allowance in hours of delivery is added on top.
Vessel volume uses the ideal-gas density at the stated storage pressure and temperature, divided by a usable volume fraction. That is a screening volume, not a vessel specification or a code calculation.
Boil-off, permeation, heel and weekly profiles are unmodelled. If production and delivery windows coincide for 24 hours, the working buffer can fall to zero; the safety buffer remains.
EngiMetric / green hydrogen educational workbench
Green Hydrogen Plant — Educational Screening Workbench
Loading the hydrogen project state...
Draft development workbench (noindex). Inputs are saved in this browser only. Calculations shown are screening/educational outputs from the existing model where implemented; missing or unsupported quantitative areas remain explicit. Completing stages records self-declared learning progress only — it is not quantitative engineering capability, not an OEM guarantee, and not industrial/project approval.
Stage
Inputs
Edit the screening inputs for this stage, then calculate. Values you enter are marked as user-entered in the local project state; defaults remain illustrative until replaced.
Screening results
Results come from the existing hydrogen screening model. Unsupported quantitative areas, missing evidence, and review requirements remain explicit; outputs are not certified design or approval decisions.
Process & balance context
This educational workbench presents stage-specific calculated outputs and limitations. Detailed interactive diagrams are not required for journey completion; use the stage results and assumptions panels to review boundaries, flows, energy, storage, and economics context.
Assumptions, limitations & review
Your deliverable for this stage
A storage inventory, safety buffer and screening vessel volume.
Stage assumptions, limits and sources
Assumptions
- Daily production mass equals daily delivery mass.
- Density is ideal-gas at storage T and P.
Constraints
- Delivery hours must be between 1 and 24.
Limitations
- No boil-off, leak, heel or seasonal profile.
- No vessel geometry, wall thickness or code selection.
Review status
- Needs engineering review
- Professional review is required before publication or use as a design basis.
Sources
- CIAAW - Standard Atomic Weightsstandards
- NIST Chemistry WebBook - Hydrogengovernment
- U.S. Department of Energy - Hydrogen Production: Electrolysisgovernment
- IEA - Global Hydrogen Review 2024, Hydrogen productionresearch institution
- IRENA - Electrolyser costsengineering org
Stage progress is stored in this browser only. The explanation and every limit on this page remain readable with JavaScript disabled; the calculators need it to run.