Stage 10 of 15 / Calculation
Account for plant utilities and cooling
Show balance-of-plant and cooling auxiliary power as explicit utilities, not as a hidden adder on stack kWh/kg.
- Advanced
- 15 stages
- 12 min
- Process and energy systems
After this stage you can
- Separate BOP kW from cooling auxiliary kW.
- State waste heat as stack power minus H₂ LHV power.
- Name which utilities remain unmodelled.
The engineering
Balance-of-plant kilowatts are the owned auxiliary input: water pumps, HVAC, controls and other plant loads inside the hydrogen battery limit you choose. Cooling auxiliary is modelled as a fraction of stack waste heat, where waste heat is stack power minus hydrogen LHV power.
That cooling ratio is an assumption, not a chiller COP map. If you have equipment data, change the ratio or fold proven loads into BOP. Do not bury them in the stack specific-electricity figure.
Transformer, rectifier and grid-connection losses are outside the stack unless you enter them as BOP.
EngiMetric / green hydrogen educational workbench
Green Hydrogen Plant — Educational Screening Workbench
Loading the hydrogen project state...
Draft development workbench (noindex). Inputs are saved in this browser only. Calculations shown are screening/educational outputs from the existing model where implemented; missing or unsupported quantitative areas remain explicit. Completing stages records self-declared learning progress only — it is not quantitative engineering capability, not an OEM guarantee, and not industrial/project approval.
Stage
Inputs
Edit the screening inputs for this stage, then calculate. Values you enter are marked as user-entered in the local project state; defaults remain illustrative until replaced.
Screening results
Results come from the existing hydrogen screening model. Unsupported quantitative areas, missing evidence, and review requirements remain explicit; outputs are not certified design or approval decisions.
Process & balance context
This educational workbench presents stage-specific calculated outputs and limitations. Detailed interactive diagrams are not required for journey completion; use the stage results and assumptions panels to review boundaries, flows, energy, storage, and economics context.
Assumptions, limitations & review
Your deliverable for this stage
A utilities statement with BOP and cooling power called out.
Stage assumptions, limits and sources
Assumptions
- Cooling power is a fixed fraction of stack waste heat.
- BOP is a design-point kW, not a load list.
Constraints
- Cooling ratio is checked against a 20–60 % screening band.
Limitations
- No chiller, cooling-tower or heat-rejection equipment sizing.
- No instrument-air, nitrogen or chemical-dosing model.
Review status
- Needs engineering review
- Professional review is required before publication or use as a design basis.
Sources
- CIAAW - Standard Atomic Weightsstandards
- NIST Chemistry WebBook - Hydrogengovernment
- U.S. Department of Energy - Hydrogen Production: Electrolysisgovernment
- IEA - Global Hydrogen Review 2024, Hydrogen productionresearch institution
- IRENA - Electrolyser costsengineering org
Stage progress is stored in this browser only. The explanation and every limit on this page remain readable with JavaScript disabled; the calculators need it to run.
Stage kind: Calculation / Journey: green-hydrogen / Stage: utilities